Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Underwater Sill Augmentation in Mississippi River [Image 2 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Underwater Sill Augmentation in Mississippi River

    NEW ORLEANS, LOUISIANA, UNITED STATES

    09.26.2023

    Photo by Ryan Labadens 

    U.S. Army Corps of Engineers, New Orleans District

    Personnel from the U.S. Army Corps of Engineers, New Orleans District, and their construction partners worked to augment an underwater sill in the Mississippi River Sept. 26, 2023, to help fight saltwater intrusion into the river from the Gulf of Mexico. USACE built up the current sill to an elevation of -30 feet while maintaining a 620-foot-wide navigation lane at -55 feet to allow for deep draft navigation. The initial sill, which was completed in July 2023, was constructed to an elevation of -55 feet, which means the top of the sill was 55 feet below the surface of the river. Saltwater intrusion is a naturally occurring phenomenon when the river flows fall below 300,000 cubic feet per second (cfs) because the mass of fresh water is no longer capable of preventing saltwater from moving into the below-sea-level river channel. Sill augmentation was completed Oct. 12, 2023. (U.S. Army photo by Ryan Labadens)

    IMAGE INFO

    Date Taken: 09.26.2023
    Date Posted: 08.27.2024 11:21
    Photo ID: 8612338
    VIRIN: 230926-A-GA223-8877
    Resolution: 5166x3437
    Size: 2.31 MB
    Location: NEW ORLEANS, LOUISIANA, US
    Hometown: NEW ORLEANS, LOUISIANA, US

    Web Views: 17
    Downloads: 3

    PUBLIC DOMAIN