Wes Safarik (left), FLW area office resident engineer, and Brad Slone (right), engineering technician, walk the AIT barracks renovation site at Fort Leonard Wood. This contract was awarded in September of 2023 and the project is estimated to be complete in 2026.
Date Taken: | 08.21.2024 |
Date Posted: | 09.23.2024 14:44 |
Photo ID: | 8657064 |
VIRIN: | 240821-A-OK605-6139 |
Resolution: | 6000x4000 |
Size: | 4.64 MB |
Location: | US |
Web Views: | 13 |
Downloads: | 2 |
This work, Fort Leonard Wood USACE Area Office [Image 6 of 6], by Samuel Weldin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.