Contractors prepare the surface of a water tower at the Louisville VA Medical Center for a second coat of paint Oct. 2, 2024.
Date Taken: | 10.02.2024 |
Date Posted: | 10.04.2024 13:04 |
Photo ID: | 8678590 |
VIRIN: | 241002-A-GI410-1004 |
Resolution: | 3000x2000 |
Size: | 839.68 KB |
Location: | LOUISVILLE, KENTUCKY, US |
Web Views: | 7 |
Downloads: | 2 |
This work, Construction continues at the Louisville VA Medical Center Oct. 2, 2024 [Image 11 of 11], by Michael Maddox, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.