A contractor prepares to excavate soil to install a new filtration system for a drinking water well at Shaw Air Force Base, S.C., July 8, 2024. The base drinking water well working group, composed of members from the 20th Civil Engineer Squadron environmental department and 20th Medical Group bioenvironmental engineers, works to determine levels of chemical substances near base wells and administer solutions as necessary to ensure safe water for base personnel. (U.S. Air Force photo by Senior Airman Steven Cardo)
Date Taken: | 07.08.2024 |
Date Posted: | 10.31.2024 12:24 |
Photo ID: | 8728489 |
VIRIN: | 240708-F-VV695-1022 |
Resolution: | 5171x3694 |
Size: | 1.66 MB |
Location: | SHAW AIR FORCE BASE, SOUTH CAROLINA, US |
Web Views: | 2 |
Downloads: | 1 |
This work, Base Well 3 back in action: New system safeguards Shaw’s water supply [Image 9 of 9], by SrA Steven Cardo, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.