Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Out with the old, in with the new: Bulkhead gates at Gavins Point Dam replaced for the first time [Image 4 of 23]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Out with the old, in with the new: Bulkhead gates at Gavins Point Dam replaced for the first time

    Contractors from Barnhart Crane and Rigging Co. use a mobile crane to reomve a 38,000-pound draft tube bulkhead gate from the tailrace side of the Gavins Point Dam powerhouse October 22, 2024. The gate is original to the dam constructed in 1957 and was replaced in accordance with lifecycle specifications. (U.S. Army Corps of Engineers photo by Delanie Stafford)

    IMAGE INFO

    Date Taken: 10.22.2024
    Date Posted: 11.26.2024 16:39
    Photo ID: 8773638
    VIRIN: 241022-A-KS317-1009
    Resolution: 3300x2141
    Size: 2.22 MB
    Location: US

    Web Views: 4
    Downloads: 1

    PUBLIC DOMAIN