An Airman points to an installation map during the Osan Planning Charrette at Osan Air Base, Republic of Korea, Jan. 6, 2025. A planning charrette shrinks the time it takes to brainstorm, troubleshoot, deconflict, and organize ideas and inputs around what infrastructure decisions will best suit the needs of the future of a base. The goal is for this year’s planning to be fully manifested and wholly supporting the missions assigned to the 51st Fighter Wing by 2035. (U.S. Air Force photo by Staff. Sgt. Kahdija Slaughter)
Date Taken: | 01.06.2025 |
Date Posted: | 01.15.2025 00:10 |
Photo ID: | 8830744 |
VIRIN: | 250106-F-BG083-1003 |
Resolution: | 2286x1526 |
Size: | 162.84 KB |
Location: | OSAN AIR FORCE BASE, GYEONGGIDO [KYONGGI-DO], KR |
Web Views: | 14 |
Downloads: | 1 |
This work, Planning Osan’s future infrastructure [Image 7 of 7], by SSgt Kahdija Slaughter, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.