St. Croix, US Virgin Islands – Jan. 15, 2025 – FEMA’s recent funding obligation of $661 million will assist the Virgin Islands Water and Power Authority with the replacement of turbines, generators, transformers and buildings at the Richmond Power Plant in Christiansted.
Date Taken: | 07.18.2024 |
Date Posted: | 01.16.2025 09:52 |
Photo ID: | 8831216 |
VIRIN: | 240718-O-WW819-1271 |
Resolution: | 3000x2000 |
Size: | 3.49 MB |
Location: | CHRISTIANSTED, ST. CROIX, USVI, VI |
Web Views: | 4 |
Downloads: | 0 |
This work, Richmond Power Plant, Christiansted, St. Croix, USVI, by Deanne Swain, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.