Construction Mechanic 3rd Class (SCW/DV) Daniel Nichols, assigned to Underwater Construction Team Two, brazes lead wires in to the cathodic protection system during pile restoration efforts at Hotel Pier in Joint Base Pearl Harbor. UCT TWO's Construction Dive Detachment ALFA is working on Hotel Pier during their deployment across the Pacific, taking them to Pearl Harbor, Timor-leste, South Korea and the Marshall Islands. UCT TWO provides responsive inshore and ocean underwater construction, inspection, repair and maintenance to ocean facilities. (Photo By Chief Elisia Correa)
Date Taken: | 03.09.2013 |
Date Posted: | 03.18.2013 19:49 |
Photo ID: | 889466 |
VIRIN: | 130309-N-ZZ999-001 |
Resolution: | 1920x1080 |
Size: | 938.87 KB |
Location: | PEARL HARBOR, HAWAII, US |
Web Views: | 150 |
Downloads: | 10 |
This work, Cathodic protection installation at Hotel Pier [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.