Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    USACE installing oxygen diffusion system to boost hydropower efficiency at Wolf Creek Dam

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    USACE installing oxygen diffusion system to boost hydropower efficiency at Wolf Creek Dam

    JAMESTOWN, KENTUCKY, UNITED STATES

    03.26.2025

    Photo by Michael Davis 

    U.S. Army Corps of Engineers, Nashville District

    Two cranes position one of eight 34.5-foot-tall vaporizers into place at the new Wolf Creek Dam cryogenic facility in Jamestown, Kentucky on March 26, 2025. This system will allow the U.S. Army Corps of Engineers to diffuse oxygen into the upstream Cumberland reservoir, boosting hydropower efficiency. (Courtesy photo)

    IMAGE INFO

    Date Taken: 03.26.2025
    Date Posted: 03.28.2025 08:48
    Photo ID: 8940953
    VIRIN: 250326-A-A1409-1102
    Resolution: 2857x2143
    Size: 3.08 MB
    Location: JAMESTOWN, KENTUCKY, US

    Web Views: 15
    Downloads: 2

    PUBLIC DOMAIN