Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    First Construction Contract Awarded for Brandon Road Interbasin Project

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    First Construction Contract Awarded for Brandon Road Interbasin Project

    JOLIET, ILLINOIS, UNITED STATES

    02.11.2025

    Photo by James Finn 

    U.S. Army Corps of Engineers, Rock Island District

    Contractors remove sand, silt and riverbed rock from the channel below the Brandon Rock Lock in preparation for construction of the Brandon Road Interbasin Project near Joliet, Illinois.

    IMAGE INFO

    Date Taken: 02.11.2025
    Date Posted: 04.25.2025 11:57
    Photo ID: 8993949
    VIRIN: 250211-A-EY724-5709
    Resolution: 6720x4480
    Size: 7.38 MB
    Location: JOLIET, ILLINOIS, US

    Web Views: 2
    Downloads: 0

    PUBLIC DOMAIN