Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    514 FLTS flight ops continue during runway construction

    514 FLTS Flight Ops Continue

    Photo By Alex R. Lloyd | 75th Operations Squadron air traffic controllers (left to right) Senior Airman Charles...... read more read more

    HILL AIR FORCE BASE, UTAH, UNITED STATES

    07.29.2019

    Story by Alex R. Lloyd 

    Hill Air Force Base

    HILL AIR FORCE BASE, Utah – Though the Hill Air Force Base runway has been closed for several weeks due to a major runway reconstruction project, that doesn’t mean that all flying operations had to be cancelled.

    With the F-35A Lightning II’s from the active duty 388th and Reserve 419th Fighter Wings being deployed during this same time, the Ogden Air Logistics Complex still needed to get aircraft in and out of the base on an almost daily basis.

    For this to happen, pilots from the 514th Flight Test Squadron needed to use the taxiway that runs parallel to the runway.

    “In normal training you don’t train for landing on such a narrow taxiway,” said F-22 Raptor test pilot Maj. Philip “Stonewall” Johnson. “We did a certification program in the squadron, which consisted of ground training and one flight where we landed on the taxiway before we could accomplish any functional check flights in any non-airworthy aircraft.”

    At 2.5 miles long, the taxiway is plenty long enough, it’s just quite narrow in most areas and isn’t as smooth a surface as a runway is designed to be.

    Using the taxiway also meant landing and taking off much closer to buildings that are located just to the west side of the taxiway, which caused crosswinds to affect the aircraft in a much different way.

    With operating hours ranging from 11 a.m. to 4 p.m., summer brought fair weather allowing the pilots to operate in and out of the base without the use of instrument landing aides.

    “We were all surprised how easy is was to become comfortable to land and takeoff from the taxiway,” Johnson said.

    The base runway reopened July 29. Some construction will continue on the south ramp during the following weeks.

    NEWS INFO

    Date Taken: 07.29.2019
    Date Posted: 07.29.2019 16:46
    Story ID: 333524
    Location: HILL AIR FORCE BASE, UTAH, US

    Web Views: 139
    Downloads: 0

    PUBLIC DOMAIN