Construction work is shown in July 2022 in the 1600 block of the cantonment area at Fort McCoy, Wis., on a second new transient training troops barracks project on the post.
The $18.8 million project was awarded to L.S. Black Constructors, which is the contractor who built the first barracks building at Fort McCoy, according to the U.S. Army Corps of Engineers Resident Office at Fort McCoy. In July the project reached 95 percent completion.
The contract was awarded Sept. 29, 2020, and the notice to proceed was issued Oct. 28, 2020. The contract duration is scheduled for completion in 780 calendar days. Currently contract completion is scheduled for December 2022.
The barracks is different than the traditional barracks located throughout the installation. This new building will be four stories and able to house 400 people in approximately 60,000 square feet. The building is being built with the latest in construction materials and include state-of-the-art physical security and energy-saving measures.
The project also is part of the Fort McCoy Master Plan that looks at continuously upgrading the installation’s infrastructure to be prepared for the future.
The Army Corps of Engineers is managing the project.
Fort McCoy’s motto is to be the “Total Force Training Center.” Located in the heart of the upper Midwest, Fort McCoy is the only U.S. Army installation in Wisconsin.
The installation has provided support and facilities for the field and classroom training of more than 100,000 military personnel from all services nearly every year since 1984.
Learn more about Fort McCoy online at https://home.army.mil/mccoy, on the Defense Visual Information Distribution System at https://www.dvidshub.net/fmpao, on Facebook by searching “ftmccoy,” and on Twitter by searching “usagmccoy.”
Also try downloading the Digital Garrison app to your smartphone and set “Fort McCoy” or another installation as your preferred base.
Date Taken: | 07.29.2022 |
Date Posted: | 07.29.2022 14:55 |
Story ID: | 426134 |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 10 |
Downloads: | 0 |
This work, Photo Essay: Barracks construction on second barracks continues in July 2022 at Fort McCoy, by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.