Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Army Successfully Demonstrates Launched Effects System

    Launch of the ALTIUS 700

    Photo By David Hylton | The Uncrewed Aircraft Systems Project Management Office, in collaboration with the...... read more read more

    FORT CAMPBELL, KENTUCKY, UNITED STATES

    12.21.2023

    Courtesy Story

    Program Executive Office, Aviation

    The Uncrewed Aircraft Systems Project Management Office, in collaboration with the U.S. Special Operations Command, executed a successful flight demonstration involving the first launch of the Air-Launched, Tube-Integrated Unmanned System (Altius) 700 air vehicle on Dec. 3, at Fort Campbell, Kentucky. The event marks a significant milestone in the Army’s Launched Effects program.

    The demonstration, which used a Black Hawk as the launch platform, served as a significant risk reduction event for upcoming Altius 700 test flights. The system was developed as an air vehicle solution to address the size, weight, and power requirements in the approved May 2020 Launched Effects Abbreviated Capabilities Development Document.

    Launched effects will bring a critical capability to the Army with advanced teaming between crewed and uncrewed systems to detect, identify, locate, and report pacing threats in contested environments. The transformational capabilities launched effects brings to large scale combat operations provide Corps, Division, and Joint commanders with effective and timely targeting, enabling fires and effects at the time and place of need.

    The two-flight demonstration yielded positive data that validates the Altius 700’s performance capabilities across all phases of operation, encompassing launch, flight, landing, and recovery. The insights gained from the demonstration are instrumental to refining the system’s design and operating procedures ahead of the program’s upcoming test flights.

    The first test flight of the fully integrated launched effects prototype is scheduled to take place early 2024. The test will demonstrate the prototype’s performance with the payloads and mission system controlled by the prototype Scalable Control Interface software. Additional testing will follow, leading up to a final operational demonstration by the end of the fiscal year 2024 and a rapid fielding decision of the launched effects prototype scheduled in 2025.

    NEWS INFO

    Date Taken: 12.21.2023
    Date Posted: 12.21.2023 17:57
    Story ID: 460615
    Location: FORT CAMPBELL, KENTUCKY, US

    Web Views: 1,280
    Downloads: 2

    PUBLIC DOMAIN