Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Fort Carson receives first of its kind ‘GridStar Flow’ battery

    Fort Carson receives first of its kind ‘GridStar Flow’ battery

    Photo By Jordyn McCulley | FORT CARSON, Colo. — The Hon. Rachel Jacobson, assistant secretary of the Army,...... read more read more

    FORT CARSON, COLORADO, UNITED STATES

    11.20.2024

    Story by Jordyn McCulley 

    Fort Carson Public Affairs Office

    FORT CARSON, Colo. — The Hon. Rachel Jacobson, assistant secretary of the Army, Installations, Energy and Environment, and Maj. Gen. David Doyle, commanding general, 4th Infantry Division and Fort Carson, cut the ceremonial ribbon celebrating a new energy-efficient, large flow battery system pilot program Nov. 20, on Fort Carson.

    “The ‘GridStar Flow’ battery is the future of energy storage and sustainability at Fort Carson, the U.S. Army and Department of Defense,” said Dr. Andrew Nelson, director, Construction Engineering Research Laboratory, U.S. Army Corps of Engineers. “It’s a long-duration energy storage system on a military installation holding 10 Mega-Watt hours of energy.”

    The one-megawatt ‘GridStar Flow’ energy storage system is able to discharge energy for 10 hours. This equates to 400 homes which will be able to receive uninterrupted power, said Joe Wyka, deputy garrison commander.

    The ‘GridStar Flow’ battery involved a lot of collaboration from Fort Carson’s Directorate of Public Works, U.S. Army Corps of Engineers – Omaha District, U.S. Army Corps of Engineers – Huntsville, Colorado Springs Utilities and Lockheed Martin to enhance Fort Carson’s energy resilience.

    “At Fort Carson this project will save us money, increase our installation’s energy and natural disaster resilience and enhance our ability to fight on any battlefield as a power projection platform,” said Doyle.
    Steven Botwinik, vice president of Advanced Programs Execution and Transition, Lockheed Martin Missiles and Fire Control, gave more insight on the ‘GridStar Flow’ battery.

    “The ‘GridStar Flow’ demonstration unit is a one-megawatt demonstrator that will discharge power for up to 10 hours to enhance grid resiliency for the U.S. Army Fort Carson. And it's the first of its kind. No other product can provide this level of robust flexible energy storage while sustaining power for extended periods of time.”

    For more information about Fort Carson’s initiatives visit https://home.army.mil/carson/.

    NEWS INFO

    Date Taken: 11.20.2024
    Date Posted: 11.25.2024 14:23
    Story ID: 486095
    Location: FORT CARSON, COLORADO, US

    Web Views: 59
    Downloads: 0

    PUBLIC DOMAIN