Contractors complete electrical work Dec. 10, 2024, on the cantonment area at Fort McCoy, Wis.
Fort McCoy and Xcel Energy are in the process of changing the electrical grid on post from a Delta Electrical System to a Wye Electrical System, Fort McCoy Directorate of Public Works officials said.
Wye is a three-phase electrical system that uses a wire for each electrical leg and a separate neutral wire.
Delta is also a three-phase but uses one of the legs as the neutral, so it only has three wires.
Fort McCoy’s motto is to be the “Total Force Training Center.” Located in the heart of the upper Midwest, Fort McCoy is the only U.S. Army installation in Wisconsin.
The installation has provided support and facilities for the field and classroom training of more than 100,000 military personnel from all services nearly every year since 1984.
Learn more about Fort McCoy online at https://home.army.mil/mccoy, on Facebook by searching “ftmccoy,” on Flickr at https://www.flickr.com/photos/fortmccoywi, on X (formerly Twitter) by searching “usagmccoy,” on Instagram at https://www.instagram.com/fortmccoywi, and on YouTube at https://www.youtube.com/@fortmccoy.
Also try downloading the My Army Post app to your smartphone and set “Fort McCoy” or another installation as your preferred base. Fort McCoy is also part of Army’s Installation Management Command where “We Are The Army’s Home.”
Date Taken: | 12.26.2024 |
Date Posted: | 12.26.2024 11:10 |
Story ID: | 488318 |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 723 |
Downloads: | 0 |
This work, Photo Story: Fort McCoy continues working with provider to improve its electrical grid during December 2024, by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.