Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Oahe Dam Release, Pierre, SD Flooding and Temporary Flood Damage Reduction Measures

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    PIERRE, SOUTH DAKOTA, UNITED STATES

    06.13.2011

    Video by Patrick Bloodgood 

    U.S. Army Corps of Engineers Headquarters

    Broll of the Oahe Dam releasing water at 150,000 Cubic Feet per Second, as well as aerials of Fort Pierre, SD, and ground level shots of the temporary flood damage reduction levees put into place. Available in high definition.

    VIDEO INFO

    Date Taken: 06.13.2011
    Date Posted: 06.14.2011 01:23
    Category: B-Roll
    Video ID: 117948
    VIRIN: 110614-A-OI229-377
    Filename: DOD_100190446
    Length: 00:04:06
    Location: PIERRE, SOUTH DAKOTA, US

    Video Analytics


    Downloads: 15
    High-Res. Downloads: 15

    PUBLIC DOMAIN