On Nov. 15, 2010, the U.S. Army Corps of Engineers released the Draft General Re-evaluation Report (GRR) and Environmental Impact Statement (EIS) on a proposal to deepen the Savannah Harbor. The GRR and EIS identify the tentatively selected 47-foot "National Economic Development Plan" and the "Maximum Authorized Depth" Plan of 48 feet and explore the Engineering, Environmental and Economic aspects fo the project. A single plan will be recommended in the final report, which is scheduled for release in the fall of 2011. For more information go to www.sas.usace.army.mil Available in HD. Produced by Sandra Hudson.
Date Taken: | 10.01.2010 |
Date Posted: | 09.29.2011 14:36 |
Category: | Package |
Video ID: | 126733 |
VIRIN: | 101001-A-ZZ999-001 |
Filename: | DOD_100251836 |
Length: | 00:06:10 |
Location: | SAVANNAH, GEORGIA, US |
Downloads: | 3 |
High-Res. Downloads: | 3 |
This work, Understanding the Savannah Harbor Expansion Project, by Sandra Hudson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.