Shortly before 8 a.m. on June 1, 2011, the U.S. Army Corps of Engineers opened the gates to pass flood waters for the first time from the Garrison Dam spillway. Seven gates were opened to the height of one foot each to release some 7,500 cubic feet per second of floodwaters. By Kevin Wingert, U.S. Army Corps of Engineers, Omaha District.
Date Taken: | 06.01.2011 |
Date Posted: | 08.27.2012 10:02 |
Category: | Package |
Video ID: | 153064 |
VIRIN: | 110601-A-JL076-230 |
Filename: | DOD_100475164 |
Length: | 00:01:29 |
Location: | NORTH DAKOTA, US |
Downloads: | 7 |
High-Res. Downloads: | 7 |
This work, Garrison Dam Historic Spillway Gate Opening, by Kevin Wingert, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.