The U.S. Army Corps of Engineers, Omaha District opened the spillway gates at Garrison Dam on June 1, 2011, to pass floodwaters for the first time. A routine inspection during the start up procedure identified a spray of water. The project operations manager for Garrison Dam, Todd Lindquist, explains what caused the spray and how the Corps addressed it. Video by Kevin Wingert, U.S. Army Corps of Engineers, Omaha District.
Date Taken: | 06.04.2011 |
Date Posted: | 08.27.2012 10:00 |
Category: | Package |
Video ID: | 153065 |
VIRIN: | 110604-A-JL076-512 |
Filename: | DOD_100475165 |
Length: | 00:01:58 |
Location: | NORTH DAKOTA, US |
Downloads: | 7 |
High-Res. Downloads: | 7 |
This work, Garrison Dam Spillway Apron Maintenance, by Kevin Wingert, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.