Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th
Talks to a KIRO-TV reporter in Seattle, Wash. about, being the engineering director where they build Army facilities.
Date Taken: |
06.19.2008 |
Date Posted: |
06.19.2008 15:21 |
Category: |
Interviews |
Video ID: |
40383 |
Filename: |
DOD_100020784 |
Length: |
00:07:37 |
Location: |
AF |
Video Analytics
Downloads: |
2 |
High-Res. Downloads: |
0 |
PUBLIC DOMAIN
MORE LIKE THIS
CONTROLLED VOCABULARY KEYWORDS
TAGS