The video shows a time lapse of the downriver Dissolved Oxygen Injection System construction site from April - June 2016.
Date Taken: | 06.08.2016 |
Date Posted: | 06.08.2016 13:35 |
Category: | B-Roll |
Video ID: | 467878 |
VIRIN: | 160608-A-FJ127-001 |
Filename: | DOD_103373194 |
Length: | 00:00:27 |
Location: | SAVANNAH, GEORGIA, US |
Downloads: | 0 |
High-Res. Downloads: | 0 |
This work, Dissolved Oxygen Injection System Update, by Jeremy Buddemeier, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.