A time lapse video shows the progress CDM Smith Construction has made at the Dissolved Oxygen Injection System, a major mitigation feature of the Savannah Harbor Expansion Project, down river site as of Aug. 19, 2016.
Date Taken: | 08.19.2016 |
Date Posted: | 08.23.2016 10:46 |
Category: | B-Roll |
Video ID: | 480320 |
VIRIN: | 160819-A-FJ127-001 |
Filename: | DOD_103599191 |
Length: | 00:00:39 |
Location: | SAVANNAH, GEORGIA, US |
Downloads: | 2 |
High-Res. Downloads: | 2 |
This work, Dissolved Oxygen System time lapse, by Jeremy Buddemeier, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.