Army officials are breaking ground on a decades-long environmental remediation project to lift contaminants out of acres of land located on Redstone Arsenal near Huntsville, Alabama.
Across football field-sized areas that became contaminated with industrial chemicals, workers employ a hot new approach to soil and groundwater remediation. They use an environmental treatment method called electrical resistance heating (ERH) to boil contaminates out of acres of land for reutilization.
(U.S. Army Corps of Engineers video by Chelsea Smith)
Date Taken: | 11.08.2016 |
Date Posted: | 11.08.2016 09:27 |
Category: | Package |
Video ID: | 491600 |
VIRIN: | 161101-A-XV621-001 |
Filename: | DOD_103829270 |
Length: | 00:01:42 |
Location: | HUNTSVILLE, ALABAMA, US |
Downloads: | 2 |
High-Res. Downloads: | 2 |
This work, 'Boiling Hot' Leads to Cool Results, by TSgt Chelsea Smith, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.