The ribbon was cut today on the upgraded JBLM Wastewater Treatment Plant that will serve all of JBLM, Camp Murray, and the VA Center in Lakewood. This facility replaces the Solo Point WWTP which was built in the 1950s, and ensures JBLM meets current and future water quality requirements for Puget Sound.
Date Taken: | 11.21.2016 |
Date Posted: | 11.22.2016 17:36 |
Category: | Briefings |
Video ID: | 494671 |
VIRIN: | 161121-D-ML822-301 |
Filename: | DOD_103874038 |
Length: | 00:28:34 |
Location: | WASHINGTON, US |
Downloads: | 0 |
High-Res. Downloads: | 0 |
This work, JBLM Wastewater Treatment Plant Ribbon Cutting, by Robert Coronado, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.