BMs in Sasebo repair and maintain two barrier boats in Oct. 2017 to save the Navy $120,000 in potential contractor fees.
Date Taken: | 10.05.2017 |
Date Posted: | 10.20.2017 00:54 |
Category: | Package |
Video ID: | 556346 |
VIRIN: | 171005-N-VA308-148 |
Filename: | DOD_104931539 |
Length: | 00:00:57 |
Location: | NAGASAKI, JP |
Downloads: | 7 |
High-Res. Downloads: | 7 |
This work, Barrier Boat Maintenance, by PO2 Kyle Palasti, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.