Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Commissioning of USS Colorado

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    GROTON, CONNECTICUT, UNITED STATES

    03.17.2018

    Video by Daniel Zaborowski 

    Navy Production Division - Defense Media Activity

    Final edited version with graphics.

    This is the ship commissioning of USS Colorado (SSN 788) The ship was commissioned Saturday March 17th, 2018 in Groton, Connecticut and the sponsor is Ms. Annie Mabus.

    VIDEO INFO

    Date Taken: 03.17.2018
    Date Posted: 03.21.2018 10:07
    Category: Package
    Video ID: 590511
    VIRIN: 180320-N-WO545-001
    Filename: DOD_105429177
    Length: 01:12:48
    Location: GROTON, CONNECTICUT, US

    Video Analytics


    Downloads: 10
    High-Res. Downloads: 10

    PUBLIC DOMAIN