Seabees attached to Naval Mobile Construction Battalion 3 lay the foundation for a building extension on Diego Garcia, British Indian Ocean Territories, July 19, 2017.
Date Taken: | 07.19.2017 |
Date Posted: | 04.12.2018 05:29 |
Category: | Package |
Video ID: | 593979 |
VIRIN: | 170719-N-NV508-001 |
Filename: | DOD_105501843 |
Length: | 00:00:45 |
Location: | U.S. 7TH FLEET AREA OF RESPONSIBILITY |
Downloads: | 3 |
High-Res. Downloads: | 3 |
This work, Seabees Concreate Project, by PO2 Taylor J Vencill, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.