Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Puerto Rico: Environmental Stabilization Work Complete

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    SAN JUAN, PUERTO RICO

    09.07.2018

    Video by Andrew Kornacki 

    U.S. Army Corps of Engineers, Buffalo District

    The U.S. Army Corps of Engineers, Task Force Recovery has completed its final soil stabilization work in Puerto Rico, following the Corps of Engineers grid restoration work, marking a major milestone in the ongoing recovery efforts, Puerto Rico, September 7, 2018.

    In total approximately 600 sites were assessed, of which 53 sites required stabilization. The goal was to prevent long-term impacts by eliminating offsite erosion at sites disturbed during the emergency power restoration mission until vegetation could re-establish providing permanent soil stabilization.

    VIDEO INFO

    Date Taken: 09.07.2018
    Date Posted: 09.07.2018 15:41
    Category: Package
    Video ID: 623496
    VIRIN: 180907-A-IF251-874
    Filename: DOD_105992340
    Length: 00:00:41
    Location: SAN JUAN, PR

    Video Analytics


    Downloads: 6
    High-Res. Downloads: 6

    PUBLIC DOMAIN