There are 3 steps to #BuffaloDistrict's current repair work at the Black Rock Lock: DIG, BURN, REMOVE!
#USACE Black Rock Lock employees, the Buffalo District Dive Team and Pittsburgh District's Regional Rivers Repair Fleet (R3F) continue work on the Black Rock Lock gate repairs, including the excavation of concrete to access the anchorage needing repair. The repairs will improve the Black Rock Lock infrastructure and sustain the functionality for future navigation seasons. #BUILDINGSTRONG #MovingDirt
Date Taken: | 12.10.2018 |
Date Posted: | 12.14.2018 12:45 |
Category: | Package |
Video ID: | 648633 |
VIRIN: | 181210-A-PG036-308 |
Filename: | DOD_106301880 |
Length: | 00:00:35 |
Location: | US |
Downloads: | 3 |
High-Res. Downloads: | 3 |
This work, 3 steps to Buffalo District's excavation repair work at the Black Rock Lock, by Jess Levenson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.