Kingsely Field Civil Engineers discuss construction on base on April 23, 2019. Kingsley Field is undergoing significant construction and will be upgrading a large portion of the facilities.
Date Taken: | 04.23.2019 |
Date Posted: | 05.01.2019 13:36 |
Category: | Video Productions |
Video ID: | 676373 |
VIRIN: | 190423-Z-XE532-0001 |
PIN: | 616373 |
Filename: | DOD_106695824 |
Length: | 00:01:48 |
Location: | KLAMATH FALLS, OREGON, US |
Downloads: | 6 |
High-Res. Downloads: | 6 |
This work, Constuction at Kingsley Field, by SrA Adam Smith, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.