The Norfolk District, U.S. Army Corps of Engineers navigation team arrived at Croatan Point in Virginia Beach in early February to replace pilings and a floating dock in preparation for the next iteration of dredging.
Date Taken: | 02.12.2020 |
Date Posted: | 02.26.2020 11:09 |
Category: | Package |
Video ID: | 740844 |
VIRIN: | 200226-A-SO401-1001 |
PIN: | 200226 |
Filename: | DOD_107699517 |
Length: | 00:01:17 |
Location: | NORFOLK, VIRGINIA, US |
Downloads: | 1 |
High-Res. Downloads: | 1 |
This work, Corps replaces piling, dock ahead of Virginia Beach dredging, by Andria Allmond, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.