Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Sediment Distribution Pipe Technology Advancing Engineering With Nature® Principles

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    The U.S. Army Corps of Engineers and its Engineer Research and Development Center are currently conducting R&D to operationalize technology that separates sand from mud while it’s being transported in the discharge pipeline of an operating hydraulic dredge.

    The simple placement method from the past is being evaluated not only to establish separation performance metrics, but it is also being further developed to enhance sediment distribution capabilities to optimize targeted placement while dredging. The enhanced placement method will eliminate, or significantly reduce, the subsequent re-handling of the sediment and often exorbitant associated costs of that process. These improvements will be based on the two key Engineering With Nature® elements: using science and engineering to produce operational efficiencies, and using natural process to achieve maximum benefit.

    For more information, go to www.engineeringwithnature.org

    VIDEO INFO

    Date Taken: 10.05.2020
    Date Posted: 11.05.2020 16:25
    Category: Package
    Video ID: 769043
    VIRIN: 201005-A-AP401-1001
    Filename: DOD_108016249
    Length: 00:04:43
    Location: US

    Video Analytics


    Downloads: 3
    High-Res. Downloads: 3

    PUBLIC DOMAIN