SAN DIEGO (March 4, 2021) Salvage contractors from SMIT AMERICAS remove the air traffic control tower aboard the amphibious assault ship USS Bonhomme Richard (LHD 6) in preparation for towing. The removal of the island will improve the ship’s structural integrity and readiness for tow. (U.S. Navy video by Mass Communication Specialist 3rd Class Cosmo Walrath)
Date Taken: | 03.04.2021 |
Date Posted: | 03.12.2021 13:53 |
Category: | B-Roll |
Video ID: | 786864 |
VIRIN: | 210304-N-DC385-2001 |
Filename: | DOD_108228085 |
Length: | 00:01:30 |
Location: | SAN DIEGO, CALIFORNIA, US |
Downloads: | 31 |
High-Res. Downloads: | 31 |
This work, Salvage contractors remove pieces of USS Bonhomme Richard superstructure to ready the ship for towing, by PO3 Cosmo Walrath, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.