The U.S. Army Corps of Engineers will close the State Highway 151A bridge over Keystone Dam, March 30 from 9 a.m. to 3 p.m., to repair a hatch cover and minor concrete damage caused by the February winter storm.
Both the northeast and southeast lanes will be closed to traffic.
Commuters who regularly use the roadway should seek alternative routes.
The Keystone Dam maintenance staff has coordinated the closure with the Oklahoma Department of Transportation.
The repair work will not impact water release or powerhouse Operations at Keystone Dam.
Date Taken: | 03.23.2021 |
Date Posted: | 03.23.2021 15:37 |
Category: | Newscasts |
Video ID: | 788066 |
VIRIN: | 210323-A-PO406-976 |
Filename: | DOD_108244616 |
Length: | 00:00:28 |
Location: | TULSA, OKLAHOMA, US |
Downloads: | 2 |
High-Res. Downloads: | 2 |
This work, HWY 151A over Keystone Dam to close for maintenance, by Brannen Parrish, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.