Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Miter gate removed at Upper Mississippi Lock and Dam 2

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    HASTINGS, MINNESOTA, UNITED STATES

    07.20.2021

    Video by George Stringham 

    U.S. Army Corps of Engineers, St. Paul District

    Facebook Live video of the removal of one of the two upstream miter gates at Lock and Dam 2 near Hastings, Minn., July 20, 2021. Lock and Dam 2’s miter gates are original from the 1940s. Over time, the gates have been damaged and distressed, which has led to serviceability and safety issues. The new upstream gates are 27 feet tall and weigh 256,000 pounds, while the downstream gates are 30 feet tall and weigh 266,000 pounds. The new gates will increase navigational longevity and operational readiness in support of the economically significant navigation infrastructure.

    VIDEO INFO

    Date Taken: 07.20.2021
    Date Posted: 07.21.2021 20:41
    Category: B-Roll
    Video ID: 807483
    VIRIN: 210720-A-GX971-750
    Filename: DOD_108464041
    Length: 00:01:18
    Location: HASTINGS, MINNESOTA, US

    Video Analytics


    Downloads: 2
    High-Res. Downloads: 2

    PUBLIC DOMAIN