In 2021, the Arnold Engineering Development Complex successfully returned the 16-foot supersonic wind tunnel to service at Arnold AFB.
Date Taken: | 06.12.2021 |
Date Posted: | 11.08.2021 09:37 |
Category: | Package |
Video ID: | 820434 |
VIRIN: | 210612-F-EX543-338 |
Filename: | DOD_108664776 |
Length: | 00:02:41 |
Location: | ARNOLD AFB, TENNESSEE, US |
Downloads: | 46 |
High-Res. Downloads: | 46 |
This work, AEDC Returns 16-S Wind Tunnel to Service, by David Wright, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.