Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Final Runway Construction Update

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    UNITED STATES

    09.30.2022

    Video by Kevin Schwandt 

    55th Wing

    Final construction update for the new runway at Offutt AFB, NE, produced 10-03-22.

    VIDEO INFO

    Date Taken: 09.30.2022
    Date Posted: 10.04.2022 10:05
    Category: Package
    Video ID: 859455
    VIRIN: 220930-F-CV998-180
    Filename: DOD_109250616
    Length: 00:02:16
    Location: US

    Video Analytics


    Downloads: 7
    High-Res. Downloads: 7

    PUBLIC DOMAIN