The U.S. Army Corps of Engineers Jacksonville District
The tussocks removed and navigation route is clear. An estimated 35-40
acres of material was removed from the Okeechobee Waterway between
Julian Keen Jr. Lock and Dam, and Structure 280 (S-280).
Broll of rim canal at S-281 and HHD just north of the Julian Keen Jr. Lock
and Dam which will remain in place to prevent additional Floating vegetation
from entering the federal navigation channel.
Operations crews worked 12-hour days and weekend to quickly reopen
the Julian Keen Jr. Lock and Dam, and navigation along the waterway.
Run Time: 00;04;15;08
Date Taken: | 10.06.2020 |
Date Posted: | 01.18.2023 14:29 |
Category: | B-Roll |
Video ID: | 870707 |
VIRIN: | 201006-A-AZ289-2023 |
Filename: | DOD_109406190 |
Length: | 00:04:15 |
Location: | MOORE HAVEN, FLORIDA, US |
Hometown: | CLEWISTON, FLORIDA, US |
Hometown: | JACKSONVILLE, FLORIDA, US |
Hometown: | WEST PALM BEACH, FLORIDA, US |
Downloads: | 8 |
High-Res. Downloads: | 8 |
This work, USACE Protecting infrastructure, by Brigida Sanchez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.