Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Preconstruction engineering and design work begins for Upper Barataria Basin risk reduction project

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    NEW ORLEANS, LOUISIANA, UNITED STATES

    04.17.2023

    Video by Sye Ellis 

    U.S. Army Corps of Engineers, New Orleans District

    Preconstruction engineering and design work is underway for the Upper Barataria Basin risk reduction project, with support from the U.S. Army Corps of Engineers St. Paul District. Join Col. Cullen Jones, commander, New Orleans District, on the ground with Col. Eric Swenson, commander, St. Paul District, as they discuss the project.

    The Chief’s Report recommending this project was signed in early 2022 and the Disaster Relief Supplemental Appropriations Act, 2022 provided $8 million to begin preconstruction engineering and design. The supplemental funding of the preconstruction engineering and design phase not only signifies urgency of this project for residents but also underscores the importance of South Louisiana to the nation.

    VIDEO INFO

    Date Taken: 04.17.2023
    Date Posted: 04.25.2023 10:12
    Category: Video Productions
    Video ID: 880995
    VIRIN: 230417-O-ZM661-549
    PIN: 41723
    Filename: DOD_109596744
    Length: 00:05:16
    Location: NEW ORLEANS, LOUISIANA, US
    Hometown: NEW ORLEANS, LOUISIANA, US

    Video Analytics


    Downloads: 1
    High-Res. Downloads: 1

    PUBLIC DOMAIN