Airmen assigned to the 100th Maintenance Squadron at Royal Air Force Mildenhall perform an ISO preparation. Every 24 months, 1,800 flight hours or 1,000 landings, each KC-135 must undergo a thorough inspection known as an isochronal periodic preparation and inspection; also referred to as an ISO or PE. This type of inspection usually lasts 21 days.
Date Taken: | 08.10.2023 |
Date Posted: | 08.11.2023 09:28 |
Category: | B-Roll |
Video ID: | 893504 |
VIRIN: | 230810-F-AB266-1001 |
Filename: | DOD_109821963 |
Length: | 00:01:14 |
Location: | ENGLAND, GB |
Downloads: | 15 |
High-Res. Downloads: | 15 |
This work, 100th Maintenance Squadron ISO preparation, by SrA Alvaro Villagomez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.