A crane-operated claw onboard a derrick boat places loose stone from a barge to construct a stone breakwater in Buffalo, N.Y., Oct. 13-16, 2023. The breakwater will contain sediment dredged from the Buffalo River, to form the base of a new wetland ecosystem in the abandoned Shipping Slip 3 on the city’s Outer Harbor. (U.S. Army video by Avery Schneider)
00:00 Preparation of stone at the Port of Buffalo
00:15 Wilkeson Pointe park on Buffalo’s Outer Harbor
00:25 The abandoned Slip 3 at Wilkeson Pointe park on Buffalo’s Outer Harbor
01:10 Park and playground area adjacent to breakwater construction site at Wilkeson Pointe
01:30 Preparation at construction site with derrick boat with crane and barges
02:20 Construction of stone breakwater by grabbing and placing loose stone
04:00 Pan from park to derrick boat and tug boat in Slip 3
Date Taken: | 10.13.2023 |
Date Posted: | 10.25.2023 07:01 |
Category: | B-Roll |
Video ID: | 901507 |
VIRIN: | 231024-A-HB296-1001 |
Filename: | DOD_109956971 |
Length: | 00:04:47 |
Location: | BUFFALO, NEW YORK, US |
Downloads: | 6 |
High-Res. Downloads: | 6 |
This work, Buffalo Outer Harbor Wetland Ecosystem Phase I Construction, by Avery Schneider, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.