Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Buffalo Outer Harbor Wetland Ecosystem Phase I Construction

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    BUFFALO, NEW YORK, UNITED STATES

    10.13.2023

    Video by Avery Schneider 

    U.S. Army Corps of Engineers, Buffalo District

    A crane-operated claw onboard a derrick boat places loose stone from a barge to construct a stone breakwater in Buffalo, N.Y., Oct. 13-16, 2023. The breakwater will contain sediment dredged from the Buffalo River, to form the base of a new wetland ecosystem in the abandoned Shipping Slip 3 on the city’s Outer Harbor. (U.S. Army video by Avery Schneider)

    00:00 Preparation of stone at the Port of Buffalo
    00:15 Wilkeson Pointe park on Buffalo’s Outer Harbor
    00:25 The abandoned Slip 3 at Wilkeson Pointe park on Buffalo’s Outer Harbor
    01:10 Park and playground area adjacent to breakwater construction site at Wilkeson Pointe
    01:30 Preparation at construction site with derrick boat with crane and barges
    02:20 Construction of stone breakwater by grabbing and placing loose stone
    04:00 Pan from park to derrick boat and tug boat in Slip 3

    VIDEO INFO

    Date Taken: 10.13.2023
    Date Posted: 10.25.2023 07:01
    Category: B-Roll
    Video ID: 901507
    VIRIN: 231024-A-HB296-1001
    Filename: DOD_109956971
    Length: 00:04:47
    Location: BUFFALO, NEW YORK, US

    Video Analytics


    Downloads: 6
    High-Res. Downloads: 6

    PUBLIC DOMAIN