Cutting JP-5 pipeline connected to surge tanks, Mar. 18 2024.
Date Taken: | 03.18.2024 |
Date Posted: | 03.27.2024 18:33 |
Category: | B-Roll |
Video ID: | 917229 |
VIRIN: | 240318-N-IS471-2001 |
Filename: | DOD_110203653 |
Length: | 00:00:52 |
Location: | HAWAII, US |
Downloads: | 3 |
High-Res. Downloads: | 3 |
This work, Red Hill Bulk Fuel Storage Facility, Adit 1 Spooling, by PO1 Glenn Slaughter, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.