The Air Force Civil Engineer Center’s Natural Disaster Recovery Division in collaboration with the U.S. Army Corps of Engineers, the 325th Fighter Wing, and Hensel Phelps hosted a Topping-out Ceremony March 13, 2024, to secure the final beam on Hangar 1 at Tyndall Air Force Base, Florida. During the ceremony construction workers and base leadership signed the beam signifying it as a historical piece of the Installation of the Future. The ceremonial beam being lifted and secured to Hangar 1 is a milestone in the construction process to show the steel shell is complete and interior work can begin. Hangar 1 construction is expected to be completed in 2025 and will have space for six jets, maintenance, and offices.
Date Taken: | 03.13.2024 |
Date Posted: | 04.03.2024 15:22 |
Category: | Video Productions |
Video ID: | 917478 |
VIRIN: | 240313-F-EG306-1001 |
Filename: | DOD_110207187 |
Length: | 00:01:30 |
Location: | FLORIDA, US |
Downloads: | 3 |
High-Res. Downloads: | 3 |
This work, Hangar 1 Topping-Out Ceremony, by John Goddin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.