Salvage crews use a hydraulic shear to cut pieces of a truss into smaller pieces, April 7, 2024, in Baltimore, Maryland.
Debris and wreckage removal is on-going in support of a top priority by the Unified Command to safely and efficiently open the Fort McHenry Channel.
(U.S. Army Corps of Engineers video by Charles Delano)
Date Taken: | 04.07.2024 |
Date Posted: | 04.08.2024 16:27 |
Category: | B-Roll |
Video ID: | 918322 |
VIRIN: | 240407-A-PA223-1004 |
Filename: | DOD_110222245 |
Length: | 00:00:16 |
Location: | BALTIMORE, MARYLAND, US |
Downloads: | 33 |
High-Res. Downloads: | 33 |
This work, Crews use hydraulic shear to cut bridge truss, by Charles Delano, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.