Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Unified Command nears complete restoration of Baltimore's federal channel

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    BALTIMORE, MARYLAND, UNITED STATES

    06.01.2024

    Video by Bobby Petty  

    U.S. Army Corps of Engineers, Baltimore District   

    This b-roll, captured June 1, 2024, shows Unified Command crews making the final cuts, lifting, then transporting a 470-short-ton steel segment (identified as “Section 4B”) of Francis Scott Key Bridge to Sparrows Point, Maryland.

    Index (22 clips total):
    0:00-2:43: Different phases of Section 4B being lifted for crews to conduct a closer inspection
    2:43-2:54: Crews use oxyacetylene torches to cut two 10- to 30-ton pieces from the main structure
    2:54-3:48: Chesapeake 1000 (“Chessy”) floating crane holds 4B fully clear of remaining wreckage
    3:48-5:45: Chessy rotates, then transports Section 4B roughly 1.5 miles to Sparrows Point
    5:45-6:10: Chessy arrives at Sparrows Point to process Section 4B for recycling

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 06.01.2024
    Date Posted: 06.03.2024 08:56
    Category: B-Roll
    Video ID: 925903
    VIRIN: 240601-A-QH057-1012
    Filename: DOD_110351169
    Length: 00:06:11
    Location: BALTIMORE, MARYLAND, US

    Video Analytics


    Downloads: 20
    High-Res. Downloads: 20

    PUBLIC DOMAIN