Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Large Cavitation Channel Timelapse of Placement of the HiFoil Model

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    MEMPHIS, TENNESSEE, UNITED STATES

    06.26.2024

    Video by Devin Pisner and Travis Troller

    Naval Surface Warfare Center Carderock Division

    The test top is removed and reinstalled to accommodate the High Reynolds Number Hydrofoil (HiFoil) for a cavitation erosion prevention project at the Large Cavitation Channel at Carderock's detachment in Memphis, Tenn., July 24, 2024. Carderock's LCC is the world’s largest and most advanced high-speed, variable-pressure water tunnel facility, and is crucial for testing the Navy's ship and submarine propellers and their interactions with hulls at scales matching the largest towing and turning basins around the globe. Naval Surface Warfare Center, Carderock Division houses some of the nation's most advanced facilities for research, development, testing, and evaluation. These resources, spread across Carderock's headquarters and seven detachments, give the Navy a clear edge in developing the next generation of surface ships and submarines. (U.S. Navy video by Travis Troller & Devin Pisner)

    VIDEO INFO

    Date Taken: 06.26.2024
    Date Posted: 09.04.2024 14:55
    Category: Video Productions
    Video ID: 935548
    VIRIN: 240626-N-RT744-6698
    Filename: DOD_110540722
    Length: 00:01:21
    Location: MEMPHIS, TENNESSEE, US

    Video Analytics


    Downloads: 6
    High-Res. Downloads: 6

    PUBLIC DOMAIN