Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Gavins Point Dam Bulkhead Gate Replacement

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    Contractors with Transco Industries and Barnhart Crane and Rigging install gates on the tailrace of the Gavins Point Dam powerhouse October 21-22, 2024. The original gates were installed in 1957 when the dam was built and had reached the end of their lifecycle. (U.S. Army Corps of Engineers photos by Delanie Stafford)

    VIDEO INFO

    Date Taken: 10.22.2024
    Date Posted: 11.05.2024 09:34
    Category: B-Roll
    Video ID: 942675
    VIRIN: 240822-A-KS317-2001
    Filename: DOD_110664954
    Length: 00:06:10
    Location: US

    Video Analytics


    Downloads: 2
    High-Res. Downloads: 2

    PUBLIC DOMAIN