Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Upgrading C2: Common Aviation Command and Control (CAC2S) Phase 1, achieves Full Operating Capability With Fielding to Marine Air Control Squadron 24 [Image 5 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Upgrading C2: Common Aviation Command and Control (CAC2S) Phase 1, achieves Full Operating Capability With Fielding to Marine Air Control Squadron 24

    Sergeants Joseph Colby (left) and Cody Crabb, tactical air defense controllers, Marine Air Control Squadron 24, 4th Marine Aircraft Wing, navigate the new Common Aviation Command Control System during the training portion of their Phase I fielding Sept. 12. The new system consolidates and improves upon the previous legacy command and control systems the squadron had been using.

    IMAGE INFO

    Date Taken: 09.12.2013
    Date Posted: 09.23.2013 12:58
    Photo ID: 1024087
    VIRIN: 130912-M-VB498-018
    Resolution: 4368x2912
    Size: 4.66 MB
    Location: VIRGINIA BEACH, VIRGINIA, US

    Web Views: 385
    Downloads: 27

    PUBLIC DOMAIN