Still under construction by an Iraqi contractor, a new local courthouse is expected to open by April 2009 in the district of At Tannumah, Basra, Iraq, Aug. 21, 2008.
Date Taken: | 08.21.2008 |
Date Posted: | 08.22.2008 15:41 |
Photo ID: | 110203 |
VIRIN: | 080821-A-9792O-003 |
Resolution: | 4288x2848 |
Size: | 1.97 MB |
Location: | BASRA, IQ |
Web Views: | 52 |
Downloads: | 9 |
This work, New Courthouse is Built in Basra [Image 3 of 3], by SGT Timothy Ortez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.