Each set of wheels on the self propelled mobile transports had to be operated manually. These machines were used to transport the bridge nearly 260 yards across a major causeway into its final position. The bridge will now connect the Naval Support Activity Bahrain 1 and 2.
Date Taken: | 02.28.2014 |
Date Posted: | 03.03.2014 15:40 |
Photo ID: | 1178224 |
VIRIN: | 140228-A-CE999-012 |
Resolution: | 4752x3168 |
Size: | 5.73 MB |
Location: | BH |
Web Views: | 40 |
Downloads: | 3 |
This work, Bahrain bridge move huge engineering feat [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.